Shingle Creek and West Mississippi Watershed Management Commissions
  • Home
  • Commissions
    • Meetings >
      • Minutes & Meeting Packets
      • TAC Meetings
      • Presentations
    • Shingle Creek Commissioners
    • West Mississippi Commissioners
    • Technical Advisory Committee
    • Staff
    • Fourth Generation Management Plan >
      • 3rd Generation Plan
    • Annual Reports >
      • Annual Report Archive
    • Budget
    • History
    • Maps
    • Member City Resources
  • Project Reviews
    • Application Materials
    • Standard Details
    • Recent Projects
  • Studies and Projects
    • Monitoring Program
    • Water Quality
    • TMDLs and Studies >
      • TMDLs
      • Studies
    • Projects >
      • Completed Projects >
        • Bass Creek Restoration
        • Bass CLP treatment
        • Bass Lake Vegetation Transplants
        • Bass and Pomerleau Alum Treatments
        • Biochar Filters
        • Connections at Shingle Creek
        • Connections II Stream Restoration
        • Crystal Lake Management Plan
        • SRP Reduction Project
        • Twin Lake Carp Management >
          • Carp Tracking
          • Twin Lake Next Steps
        • Wetland 639W
      • Projects Underway >
        • Eagle and Pike Internal Load Management
        • Curly Leaf Pondweed Treatment
        • Meadow Lake Management Plan
  • What You Can Do
    • Cost Share
    • Smart Salting
    • Resources
    • Volunteer to Help
    • Volunteer Monitoring
    • Links to Learn More
  • Contact Us

Standard Details and Specifications

The Commissions' consultants have assembled the following stormwater BMP standard detail drawings, specifications, and SOPs for your reference and use. They reflect years of design and construction experience and accumulated best practices. Use of these standard details is not required, however, if you will be amending soil on site for infiltration credit you must use this specification and pass the inspection test, and bioretention practices must meet the bioretention inspection test.

  • Amended Topsoil Specification
  • Amended Topsoil Inspection SOP
  • Bioretention Basin
  • Bioretention Swale
  • Bioretention Trench
  • Bioretention Inspection SOP
  • Filtration Shelf
  • Minnesota Filter (Iron Filing) Trench
  • Off-Line Biofiltration Basin
  • Outlet Structure
  • Porous Pavement
  • Porous Pavement Specification
  • Rain Garden
  • Slotted Barrel Drywall Manhole
  • Stauner Sediment Trap
  • Tree Trench
  • Structural Soil Specification
  • Infiltration in a DWSMA
  • Trail/Sidewalk Infiltration Options
If you have any questions about the details or would like to obtain the underlying drawings or documents, please contact the Commissions' consultant:

Eric Osterdyk, P.E., CFM
Stantec
[email protected]
612.380.4917     

Picture
An infiltration swale
Picture
A boulevard bioinfiltration basin
Picture
Installing an infiltration trench.

CONTACT US

Shingle Creek and West Mississippi
Watershed Management Commissions
3235 Fernbrook Lane N, Plymouth, MN  55447
Phone (763) 553-1144   Fax (763) 553-9326
Email [email protected]
​

WE'RE SOCIAL

Join our mailing list today!
Join Now
The Shingle Creek and West Mississippi Watersheds are on Dakota and Anishinaabe land. For more information about land acknowledgements check out the Native Governance Center website.
  • Home
  • Commissions
    • Meetings >
      • Minutes & Meeting Packets
      • TAC Meetings
      • Presentations
    • Shingle Creek Commissioners
    • West Mississippi Commissioners
    • Technical Advisory Committee
    • Staff
    • Fourth Generation Management Plan >
      • 3rd Generation Plan
    • Annual Reports >
      • Annual Report Archive
    • Budget
    • History
    • Maps
    • Member City Resources
  • Project Reviews
    • Application Materials
    • Standard Details
    • Recent Projects
  • Studies and Projects
    • Monitoring Program
    • Water Quality
    • TMDLs and Studies >
      • TMDLs
      • Studies
    • Projects >
      • Completed Projects >
        • Bass Creek Restoration
        • Bass CLP treatment
        • Bass Lake Vegetation Transplants
        • Bass and Pomerleau Alum Treatments
        • Biochar Filters
        • Connections at Shingle Creek
        • Connections II Stream Restoration
        • Crystal Lake Management Plan
        • SRP Reduction Project
        • Twin Lake Carp Management >
          • Carp Tracking
          • Twin Lake Next Steps
        • Wetland 639W
      • Projects Underway >
        • Eagle and Pike Internal Load Management
        • Curly Leaf Pondweed Treatment
        • Meadow Lake Management Plan
  • What You Can Do
    • Cost Share
    • Smart Salting
    • Resources
    • Volunteer to Help
    • Volunteer Monitoring
    • Links to Learn More
  • Contact Us