Shingle Creek and West Mississippi Watershed Management Commissions
  • Home
  • Commissions
    • Meetings >
      • Minutes & Meeting Packets
      • TAC Meetings
      • Presentations
    • Shingle Creek Commissioners
    • West Mississippi Commissioners
    • Technical Advisory Committee
    • Staff
    • Fourth Generation Management Plan >
      • 3rd Generation Plan
    • Annual Reports >
      • Annual Report Archive
    • Budget
    • History
    • Maps
    • Member City Resources
  • Project Reviews
    • Application Materials
    • Standard Details
    • Recent Projects
  • Studies and Projects
    • Monitoring Program
    • Water Quality
    • TMDLs and Studies >
      • TMDLs
      • Studies
    • Projects >
      • Completed Projects >
        • Bass Creek Restoration
        • Bass CLP treatment
        • Bass Lake Vegetation Transplants
        • Bass and Pomerleau Alum Treatments
        • Biochar Filters
        • Connections at Shingle Creek
        • Connections II Stream Restoration
        • Crystal Lake Management Plan
        • SRP Reduction Project
        • Twin Lake Carp Management >
          • Carp Tracking
          • Twin Lake Next Steps
        • Wetland 639W
      • Projects Underway >
        • Eagle and Pike Internal Load Management
        • Curly Leaf Pondweed Treatment
        • Meadow Lake Management Plan
  • What You Can Do
    • Cost Share
    • Smart Salting
    • Resources
    • Volunteer to Help
    • Volunteer Monitoring
    • Links to Learn More
  • Contact Us

Connections at Shingle Creek

The cities of Brooklyn Park and Brooklyn Center teamed up to complete a stream restoration project on Shingle Creek, part in Brooklyn Center and part in Brooklyn Park. The project extended from Brooklyn Boulevard near Park Center High School eastward about 1,400 feet, to a small drop structure in Brookdale Park. This project stabilized streambanks, added fish habitat, and improved water quality. Brooklyn Park is also filled in a missing trail segment between Brooklyn Boulevard and Noble Avenue N, and constructed an outdoor learning/viewing area with interpretive signage. A highlight of the project was the creation of a fish ladder at the drop structure - a rock ramp on the downstream side of the structure,which allows fish to swim upstream by making a series of small jumps. This project received a $200,000 grant from the Clean Water Land and Legacy Amendment.
Picture
Typical streambank prior to restoration. Erosion and mass wasting of the banks, lack of a native plant buffer, flat sandy bottom, accumulated sediment. The overwide stream is very shallow and stagnant. There is little habitat for fish and other aquatic life.
Picture
This concrete structure allows for a two foot drop in stream elevation. It was difficult for fish to jump over and was a barrier for fish migration upstream.
Picture
Early spring following restoration. Native plants are anchoring the banks. Channel has been narrowed and deepened. Rock riffles were added to increase aeration and provide fish and macroinvertebrate habitat. A new outdoor classroom provides learning space.
Picture
Rock of various sizes was added to form a ramp up and over the structure. Fish can then swim upstream by making little hops rather than one big jump.
Picture

CONTACT US

Shingle Creek and West Mississippi
Watershed Management Commissions
3235 Fernbrook Lane N, Plymouth, MN  55447
Phone (763) 553-1144   Fax (763) 553-9326
Email [email protected]
​

WE'RE SOCIAL

Join our mailing list today!
Join Now
The Shingle Creek and West Mississippi Watersheds are on Dakota and Anishinaabe land. For more information about land acknowledgements check out the Native Governance Center website.
  • Home
  • Commissions
    • Meetings >
      • Minutes & Meeting Packets
      • TAC Meetings
      • Presentations
    • Shingle Creek Commissioners
    • West Mississippi Commissioners
    • Technical Advisory Committee
    • Staff
    • Fourth Generation Management Plan >
      • 3rd Generation Plan
    • Annual Reports >
      • Annual Report Archive
    • Budget
    • History
    • Maps
    • Member City Resources
  • Project Reviews
    • Application Materials
    • Standard Details
    • Recent Projects
  • Studies and Projects
    • Monitoring Program
    • Water Quality
    • TMDLs and Studies >
      • TMDLs
      • Studies
    • Projects >
      • Completed Projects >
        • Bass Creek Restoration
        • Bass CLP treatment
        • Bass Lake Vegetation Transplants
        • Bass and Pomerleau Alum Treatments
        • Biochar Filters
        • Connections at Shingle Creek
        • Connections II Stream Restoration
        • Crystal Lake Management Plan
        • SRP Reduction Project
        • Twin Lake Carp Management >
          • Carp Tracking
          • Twin Lake Next Steps
        • Wetland 639W
      • Projects Underway >
        • Eagle and Pike Internal Load Management
        • Curly Leaf Pondweed Treatment
        • Meadow Lake Management Plan
  • What You Can Do
    • Cost Share
    • Smart Salting
    • Resources
    • Volunteer to Help
    • Volunteer Monitoring
    • Links to Learn More
  • Contact Us